Principle of process organization

The formulation is added into cutting coolant supply system from 6 to 12 hours before draining and refilling. The production machines are operated in normal mode. After the drainage the system is filled with a fresh cutting coolant.

Solutions advantages

— Cost saving up to 30% on cutting coolant
— Maintaining the lubricating and cooling properties during the process of cleaning
— Safe for the nature and human health
— Simplification of cleaning process in the cutting coolant supply system

coolant flash

What is important for a cleaning process effectiveness?

How to optimize process?